Building industrial strength across India since 1991.
Sectors Served
Steel Plant
Power Plant
Coal Mines
Projects Completed By Us
Customer Name
Work Order Name
Valuation of the Work
RML
Civil construction non-machine foundation job of SMSIV.
158,85,275.00
RML
WORK ORDER FOR CIVIL CONSTRUCTION OF PIPE
RACK, CABLE RACK FOUNDATIONS, MISCELLANEOUS
FOUNDATIONS, TGBUILDING PLASTERING WORK ETC.
NON-MACHINEFOUNDATION.
4,27,06,952.33
RML
CIVIL CONSTRUCTION WORK OF WHRB FOUNDTION
OF 2X65MW CPP (MACHINE FOUNDATION) UNDER
CHALIYAMASTEELPLANT.
60,40,249.00
WBPDCL
Renovation of external portion of power house building
ofKTPS,Stage-I and Stage-II
172,92,343.00
RML
Civil Construction of Coke Oven Project Machine Foundation
10,21,49,193.00
RML
Civil Construction of 4X900 TPD DRI at CSP (Machine
FoundationJob)
5,45,86,881.00
AMC
Construction of boundary wall of proposed Town hall at
Raniganj within R.S. Plot no: - 1279, Mouza Amrasota,
within ward no. 34 under Asansol Municipal
Corporation
66,70,749.00
RITES
Construction of E.I. Panel Buildings,Goods Storage, FOIS
Room, Weigh Bridge Room etc. including Electrification
Works along with supply, installation, testing and
commissioning of 01 (one) 140 MT In-motion Weigh
Bridge in connection with the work of Construction of
New Railway siding at Dalmia under Salanpur area, ECL,
Dist.PaschimBardhaman,WestBengal.
171,10,582.00
RML
WORK ORDER FOR CIVIL CONSTRUCTION OF PIPE
RACK, CABLE RACK FOUNDATIONS, MISCELLANEOUS
FOUNDATIONS, TGBUILDING PLASTERING WORK ETC.
NON-MACHINEFOUNDATION.
4,27,06,952.33
ECL
Construction of Store complex (Store with shed,
Store office,Washroom,POL store&Bituminous
pavement) atOC project Inder Nakrakonda -
Kumardihi ‘B’ colliery underBankolaArea”
98,11,672.00
ECL
Construction of 03 nos. Bhagwati Mandir, 03
nos. Kali Mandir,Iswari Mandir,Gaurango
Mandir,BishnuMandir,Laxmi Mandir, Shiv
Mandir and Sag Ghar at Dahuka rehabsite
underSonepur village
229,93,117.00
BLUE STAR
SAILDSPCASPkgUTIL-02RT/301
26,07,865.00
GANNON
DUNKERLEY&
CO. LTD.
Civil work at EMAMI cement plant, KOTA,
Panagarh
30,56,297.00
BAPL
Construction of Airport Entry Gate at BAPL
Township
44,59,000.00
SAIL
“Miscellaneous works package “under
Rebuilding of Coke Oven Battery Block 5A
Construction ofNewCokeOven BatteryBlock 5B
ofDurgapur SteelPlant
57,09,717.00
ELEGANT STEEL
Work order for Fabrication, Erection and
Structure job of SMS Shed & mechanized Sponge
Feeding System at SPS Steels Rolling Mills Ltd.(A
unit of Shakambhari Group.) Durgapur-06
68,82,000.00
68,82,000.00
L&T
Civil works for infrastructure Development of
BAPL Township at BAPL Andal Pkg.1. Kazi
NazrulIslamAirport,WestBengal.
84,00,000.00
ECL
Construction of Shed (48.50m x 16.50m) at
KendaAreaStoreunderKendaArea,ECL
32,69,842.00
ECL
Construction ofJan Kalyan Samiti club atDahuka
Rehabsitefor SonepurVillageunder SBArea
33,74,219.00
ECL
Construction of Store complex (Store with
shed,Store office, Wash room, POL store
andBituminous pavement) at OC project under
Nakrakonda Kumardihi B colliery under
BankolaArea
98,11,672.00
ECL
Construction of Community Hall (02nos.) one
each at Upper para and Neeche Para, Two nos.
clubs oneeachatUpperpara andNeeche Para
104,84,253.00
ECL
Block Repairing of 14 nos. block NHS(D/S)-101
units at Bhuban Centre and Debiasthan under
Nimcha (R)Colliery Satgram Area (4th call)
119,92,416.00
ECL
Construction of R.C.C. Drain around Bouri Para
Rehab under Kottadih OCP Pandaveswar Area
129,79,276.00
L&T
Laying of sewers by trenchless method.
Installation of product pipe/Casing Pipe by
suitable method including making of entry and
exit pits, all related civil work like excavation,
Shoring/ strutting etc. at Beur Sewerage
network project Patna.
150,12,000.00
ECL
Block Repairing at 110-unit NHS (D/S) qtr.
Block no-107 at NKJ unit of Khandra Colliery
162,14,341.00
ECL
Construction of workshop for low height CM
including 10 Te EOT crane at 3&4 incline,
Jhanjra Area, ECL.
164,85,420.00
ECL
Development works for new colony near VN
Colony under Sonepur Bazari Area
192,66,103.00
B&R
Work order for carrying out civil, structural and
architectural works (Package-III) for Water Pretreatment Plant Package at Tanda Thermal
Power Project Stage -II (2x66MW), Uttar
Pradesh.
290,75,667.00
TIPL
Work order for Execution of works under
Balance Road Network Package at DSP,DGP-03
334,69,133.00
RML
Work order for civil construction work for
2x350TPD DRI Plant, Captive Power Plant and
Steel Melting Shop inside Chaliyama Steel Plant